Immersion without a survey mast and/or access shaft

The remote control of the various systems used during a tunnel segment’s immersion means that such operations can be realised without either a survey mast or an access shaft. This saves time during preparations and demobilisation, minimising the number of activities on the critical planning timeline.

ActCarr_Minimizing_downtime