Marieholmstunneln

Geocon is responsible for survey, positioning and monitoring of three tunnelelements. The scope of work includes survey of cut & cover sections, tunnel elements in the dry dock and post immersion surveys. During transport, immersion and sandflow Geocon provides crucial informations about position of the element, winch loads, ballast water levels and jack loads.

Client:
Züblin/Boskalis
Location:
Gothenburg, Sweden
Number of elements:
3
Immersion:
in progress
capture 1
capture 2
capture 3
IMG-4069
capture 6

Project

Watch a short video about the Transport and Immersion of the first tunnelelement.

z4xMiXFub5s

Webcams

Livestream secondary bukhead starboard side, watch the opening of the door door, when the third element is immersed!